Residential Construction with a technical edge.
 
>>
>>
>>

2802 Barkley Project

This project was a 6800 sq ft new two story Arts & Crafts residential project with a full basement.

 




Basement foundation walls have been poured.  Installing underslab waste lines prior to basement slab pour.
Backfilling exterior of foundation.  Note brown dimpled drainage plane on basement foundation walls.
Craning in a steel I-Beam for placement one of the three moment frames.





Finishing garage and shop concrete floor.






Finished front exterior.

 Architect:
  James Henry Eserts, AIA
  Denise Castro-Bran, AIA
  858 21st Street, Studio D
  Santa Monica, CA  90405
 Title 24 Engineer:
  Solargy, Inc.
  22028 Ventura Blvd., Suite 207
  Woodland Hills, CA  91364
 Surveyor:
  JMC2
  411 H. Harbor Blvd., Suite 201
  San Pedro, CA  90731
 Structural Engineer:
  Parker-Resnick Structural Engineers
  187 E. Wilbur Road #10
  Thousand Oaks, CA  91360
 Geotechnical Engineers:
  Grover-Hollingsworth
  31129 Via Colinas, Suite 707
  Westlake, CA  91362